The team met to work from 1:30 - 5PM today, Sunday March 4th.


The writing team updated blog, published logo, and updated social media.

We are on social media in several places!


The building team mounted electronics on SLED.

We all ran test runs to discover trigger settings.

The team modified satellite holder/release system.

Comments

Popular posts from this blog

Day 3 - Tours and a Surprise Visit!

We started out the day working on our SLED and the teachers had fun on the POGO.  POGO is a simulator used by NASA since the 1960's to simulate low gravity and weightlessness EVA maneuvers. After this we went back up to our work room and heard a presentation from Matt Lemke. He talked to us about the scientific research that goes on at the ISS.  We were interrupted by astronaut Joe Acaba who has been back on the ground for 3 weeks now, having been on ISS for about 6 months. He answered questions we had and we got pictures with him. Here's a video of Joe on ISS that was just released today about one of the experiments he was running. Shortly after this we were split up and groups went to the VR and the Simulations of the Orion Capsule. After the Orion capsule visit, we walked through mission control. Following this, we worked our way back to building 9 and built accelerometers and then went to go test them at the Kema boardwalk.  This is a tourist ar...

Arrived!

Our work has arrive at NASA and is ready for us!